Project highlight: Cables and Cable Carriers on the Memorial Bridge, Portsmouth, NH

October 27, 2016
In 2014 the memorial bridge originally designed in 1922 by J.A.L. Waddell was replaced by a new bridge with cutting-edge technology. The new design maintains the spirit of the old design, but employs the use of new technologies throughout to create better safety, long term durability and cost savings. One of the “new” technologies that was selected to reach these goals was the use of an e-chain® cable management with Chainflex® cabling system from igus® in the place of the “old” standard droop cable system.
Previous Video
igus dry tech test lab
igus dry tech test lab

Take a look inside the igus® self-lubricating bearings lab. Over 15,000 tribology tests are run each year i...

Next Video
Plastic vs. PTFE bearing high speed belt tensioner pivot wear test
Plastic vs. PTFE bearing high speed belt tensioner pivot wear test

This video shows a recent belt tensioner test designed to evaluate wear of iglide® plastic bearings vs. met...