Redesigning the Portsmouth Memorial Bridge for 21st Century Reliability

January 30, 2018

Since it's initial ribbon cutting ceremony in 1923, New Hampshire's Portsmouth Memorial Bridge has served as a landmark. When it was redesigned, cost savings and maintenance reduction were the main focuses. Learn how igus® energy chain systems and the igus® engineering team helped increase the overall reliability and reduce downtime of the vertical lift bridge. 

Watch a video of this application in action here!

Previous Video
triflex® TRE.B assembly
triflex® TRE.B assembly

This clip provides an overview of how to assemble and disassemble a triflex® TRE.B energy chain.

Next Video
readychain® Harnessed System Options
readychain® Harnessed System Options

Save time, money, and hassle with readychain® fully harnessed energy supply systems with igus®. Available i...

Want to try energy chain cable carriers for yourself?

Free sample kit