Redesigning the Portsmouth Memorial Bridge for 21st Century Reliability

January 30, 2018

Since it's initial ribbon cutting ceremony in 1923, New Hampshire's Portsmouth Memorial Bridge has served as a landmark. When it was redesigned, cost savings and maintenance reduction were the main focuses. Learn how igus® energy chain systems and the igus® engineering team helped increase the overall reliability and reduce downtime of the vertical lift bridge. 

Watch a video of this application in action here!

Previous Video
How does the Port of Virginia remain a leader in the crane industry?
How does the Port of Virginia remain a leader in the crane industry?

In the ship to shore crane industry, threat of system failure is a constant. With expensive downtime, dange...

Next Flipbook
Designing gliding cable carrier systems for large machinery
Designing gliding cable carrier systems for large machinery

Compared to cable reels, bus bars or festoon systems, plastic cable carrier systems are an extremely low ma...