Project highlight: Cables and Cable Carriers on the Memorial Bridge, Portsmouth, NH

October 27, 2016

In 2014, the Memorial Bridge originally designed in 1922 by J.A.L. Waddell was replaced by a new bridge with cutting-edge technology. The new design maintains the spirit of the old design, but employs the use of new technologies throughout to improve safety and long term durability while reducing operating costs. One of the “new” technologies that was selected to reach these goals was the use of an e-chain® cable management system with chainflex® cables from igus® in the place of the “old” standard droop cable system.

Read the application story here!

Previous Video
igus solutions for kitchen and furniture applications
igus solutions for kitchen and furniture applications

igus self-lubricating bearings and linear systems and lubrication free cable carrier systems are a clean, q...

Next Video
Plastic vs. PTFE bearing high speed belt tensioner pivot wear test
Plastic vs. PTFE bearing high speed belt tensioner pivot wear test

This video shows a recent belt tensioner test designed to evaluate wear of iglide® plastic bearings vs. met...